- Patch Fitness Center Heating, Ventilation & Air Conditioning (HVAC) project
- Patch Fitness Center Husky Field Track & Lighting project
- COMPLETED AS OF 8/18/23 Phase 1: On the New Jersey Street, cables will be pulled across the street and will do that by closing a traffic lane at a time. The first lane will start on May 22 to May 30, 2023 followed by the other lane starting May 30 to Jun. 5, 2023. The asphalt layer will be completely redone by Jun. 16, 2023. In the meantime, the trench will be covered with steel plates. A waste container will also be placed on the closed lane at that time, fenced and signaled accordingly.
- Phase 2: Two parking spaces in front of the Husky Field gate will be blocked until
Nov. 30, 2023. The contractor will need the gate for access for their equipment.
Updates include:
Husky Field Track & Lighting Update
As of 5/11/2023
Blocking mission will be effective starting May 22, 2023 and will take place in 2 different phases:
As of 5/3/2023
"Work is expected to get underway in the coming weeks." For more details, see article below.
"New running track among upgrades of USAG Stuttgart fitness facilities" by John H. Campbell
HVAC Update
As of 8/18/2023
HVAC blocking mission is complete in the HUB parking lot.
As of 5/5/2023
A blocking mission will take place from June 16, 2023 at 6 a.m. and will be valid to June 19, 2023 at 10 p.m.
This will be necessary to asphalt and restripe the area of the parking lot between #2337 and #2352 where construction took place.
As of 4/18/2023
✅ Cardio Equipment: Available on the basketball court floor (equipment has been relocated)
✅ Weight Equipment: Available on the basketball court floor (equipment has been relocated)
✅ Functional Fitness: Available with two lifting stations
Locker Rooms: Closed, but shower and toilet wagons will be provided outside of the facility this week (we’ll update this post once we confirm they are open)
Nautilus Room: Available on the basketball court floor (equipment has been relocated)
Basketball/Volleyball/Racquetball Courts: Closed
💪 Check out Patch Fitness Center Group Fitness Classes here.
💳 Cashless: We are accepting credit card payments only (sorry, no cash).